Home | About Us | Job Opportunities | Contact Us

Construction Pictures

Click Photo for Larger Image

 

09-26-06(006)

Drawdown Structure

09-26-06(005)

Driving Sheet Piling for Outlet Structure

10-05-06(002)

Proposed Wetland Location

10-05-06(003)

Grouting of Riprap at Outlet Structure

10-05-06(009)

Tile Main Outlet

09-26-06(002)

Removing Borrow Material from Proposed Wetland Location

11-08-06(013)

Mulching of Tile Outlet Channel Following Completion of Seeding & Fertilizing

11-19-06(008)

Completed Tile Outlet Channel Draining into Wetland